(This post may contain affiliate links, which means that if you click on one of the product links and make a purchase, I’ll receive a small commission at no extra cost to you. This helps support the channel and allows us to continue to make videos like this. Thank you for the support!)
One form of climbing haul system progress capture is using a prusik on the load strand, tended by hand so that it doesn’t suck up into the pulley and either jam the system or keep the hitch from grabbing and capturing haul progress. I was asked if there is anything special about the VT hitch as a progress capture that would allow it to function even if we didn’t tend the hitch at all. Well, it’s not the hitch that helps so much as it’s the materials we typically use when tying it. The VT hitch does have one inherent advantage, though.
In this video, the dedicated eye-to-eye loop used to build the VT Hitch is the Blue Water VT Prusik 8mm.